Calor
Jetty and heater EC&I works
Electrical and instrumentation works on the jetty and heater packages at Calor’s Canvey Island terminal, including industrial cable containment and field equipment.
Our capabilities
JCOS manages turnkey electrical, control and instrumentation projects from the first survey to handover. Our engineers develop the design, our in-house team builds the panels and our site teams install and test the completed system.
We agree what the installation needs to do, where it connects to existing plant and how it will be accepted. A JCOS project lead coordinates the programme, costs, procurement and site work, giving your team one point of contact for progress, changes and decisions.
Our engineers develop the drawings that people use to build and test the installation. Schematics define the circuits, loop drawings trace each instrument signal, and cable schedules identify the connections between field equipment and panels. We also prepare intrinsic safety calculations where the design requires them.
We design, assemble and wire control panels in-house, including PLC panels, remote I/O assemblies and motor controls. We check the panel against the design before it goes to site, so the installation team can identify each terminal and connect the field wiring against the same drawings.
We plan the cable routes, equipment installation and site connections around access to the plant. Our technicians check the installed circuits, prove field signals at the control system and record the results for handover.
We agree with you which records the job needs.
Talk to JCOS
Discuss your requirements with the JCOS team.