FCC Environment

Outage support and analyser upgrades at Greatmoor

At Greatmoor, JCOS has delivered more than 10,000 outage hours since 2021, alongside embedded EC&I maintenance, plant improvements and commissioning.

Calvert, Buckinghamshire · Energy from waste

Supporting a live energy-from-waste facility

Greatmoor is a 25 MW energy-from-waste facility processing more than 300,000 tonnes of residual waste each year. JCOS has supported FCC at Greatmoor since 2021 across normal operations, improvement projects and annual outages. Returning year after year has given the team practical knowledge of the plant.

The work has included embedded EC&I maintenance, day-and-night outage cover, confined-space work, ATEX inspection and remedial work, rope-access cable installation, analyser upgrades and commissioning.

AMESA B monitoring enclosure installed on a Greatmoor plant platform
AMESA B monitoring equipment installed at Greatmoor

AMESA B monitoring installation

A separate project at Greatmoor involved installing AMESA B monitoring equipment. The work included mounting the analyser enclosure and routing its cabling and tubing in the new containment.

The installation photos show the enclosure, its connections and the vertical cable ladder used to reach the overhead routes.

Installed cable ladder turning into overhead containment
Vertical and overhead cable containment at Greatmoor

Six technicians mobilised within 72 hours

During the 2026 outage, JCOS mobilised six EC&I technicians within 72 hours over a bank holiday weekend for a time-critical boiler water-sampling analyser upgrade. The team worked alongside FCC to survey the installation, design the analyser-system migration and procure critical equipment.

The same team managed the installation, testing and live commissioning, then completed the as-built records for handover.

One team from survey to handover

FCC has an experienced EC&I team that can support routine maintenance, specialist projects and outage delivery. Keeping technical responsibility with one team helps urgent work move faster and leaves records that the site can use for operation, maintenance and future modification.