Supporting a live energy-from-waste facility
Greatmoor is a 25 MW energy-from-waste facility processing more than 300,000 tonnes of residual waste each year. JCOS has supported FCC at Greatmoor since 2021 across normal operations, improvement projects and annual outages. Returning year after year has given the team practical knowledge of the plant.
The work has included embedded EC&I maintenance, day-and-night outage cover, confined-space work, ATEX inspection and remedial work, rope-access cable installation, analyser upgrades and commissioning.

AMESA B monitoring installation
A separate project at Greatmoor involved installing AMESA B monitoring equipment. The work included mounting the analyser enclosure and routing its cabling and tubing in the new containment.
The installation photos show the enclosure, its connections and the vertical cable ladder used to reach the overhead routes.

Six technicians mobilised within 72 hours
During the 2026 outage, JCOS mobilised six EC&I technicians within 72 hours over a bank holiday weekend for a time-critical boiler water-sampling analyser upgrade. The team worked alongside FCC to survey the installation, design the analyser-system migration and procure critical equipment.
The same team managed the installation, testing and live commissioning, then completed the as-built records for handover.
One team from survey to handover
FCC has an experienced EC&I team that can support routine maintenance, specialist projects and outage delivery. Keeping technical responsibility with one team helps urgent work move faster and leaves records that the site can use for operation, maintenance and future modification.