← All case studies

Centrica Energy Storage+

Centrica | Easington Gas Terminal

JCOS provides embedded control and instrumentation maintenance at Easington and supports Centrica’s fire and gas system upgrade and migration works.

Easington, East Yorkshire · Gas processing

Fire and gas system upgrades

JCOS supports Centrica Energy Storage+ at its Easington onshore gas processing terminal. The upgrade work includes controlled decommissioning of existing fire and gas equipment and integration of replacement systems.

JCOS coordinates the changes with Centrica’s site team as existing equipment is taken out of service and replacement equipment is introduced.

Embedded instrumentation maintenance

JCOS technicians work alongside Centrica’s maintenance team, providing ongoing control and instrumentation support as the upgrade programme progresses.

More JCOS work

All projects

Tell us what the job needs.

Share the site, scope and timescale, or call 0333 3355 163.

Discuss your project